Sample day for a ready-meal line. Replace the products below with your own.
Line settings
Rule used: moving to a product that already contains every allergen of the last run needs only a quick changeover. Any allergen that the next product doesn't contain must be removed with a full clean.
Suggested run sheet
Products to run today
| Product | Run (h) | Allergens | Order |
|---|
Up to 12 products per day. Tap an allergen to switch it on or off.
Want this on your real schedule?
I can review your real schedule, allergen matrix and changeover procedures, and help your team run it every day. Book a plant assessment
Planning aid only. Your validated allergen control program, cleaning verification and label controls always decide what a changeover requires.